Reliability through experience

Follow us on :

1992

New highly efficient factory, processing 7,500 tons beet per day

The plant was built with a minimal investment budget, re-using equipment from two smaller sugar plants that closed down

 

DSEC Projects World Map View
Customer

FONTENOY SUGAR FACTORY

General contractor

Fontenoy Sugar Factory

Detailed engineering:

De Smet Engineers & Contractors

Scope of works

Detailed design

Industrial operation

1992

Plant capacity

7,500 tons beet per day – Sugar : CEE n° 1

Processing units
  • Beet yard: Completely automated
  • Diffuser: Tower
  • Pulp dryer: Low calorific unit
  • Evaporation: Falling film
  • Crystallisation: 3.5 strikes
  • Sugar dryer: Fluidized bed
  • Sugar silo: Vertical, metallic type